Good Afternoon,
You have participated in the planning efforts in the preparation of environmental assessment documentation for the Confederation Line West LRT Extension (Tunney’s Pasture Station to Baseline and Bayshore Stations), and a proposed Light Rail Maintenance and Storage Facility. You are receiving this email as a result of your attendance at a Public Open House, or participation in a Consultation Group at some point during the planning stage.
Planning efforts have been completed and this project is being assessed according to the Transit Project Assessment Process (TPAP) as prescribed in Ontario Regulation 231/08. As part of the TPAP, an Environmental Project Report (EPR) has been prepared by the proponent, the City of Ottawa, to document the study process, the environmental conditions, alternatives considered, the planned project, anticipated environmental impacts, appropriate mitigation and the project's consultation program. You received notice that the draft Environmental Project Report was available for review on June 2, 2016 as part of the Notice of Commencement.
The Notice of Completion (attached) indicates the finalization of the EPR, and the commencement of the 30 day public review period. The Final EPR is now available at the links below.
The Sharefile links will allow you to download portions of the report. Select the sections or appendices that you would like to download, then select ‘Download’ from the bottom-right of the window. You may download individual sections or appendices by selecting one at a time, and then selecting download. Depending on your browser you may be asked if you want to open or save the file. Select your preferred option.
Highlighting the .pdf icon will show you an option to view the file. The view function for these documents is typically not supported on Sharefile. You are required to download the documents to access them.
The link to download the EPR is: https://parsons.sharefile.com/ d-s3fa56258815485aa
The link to download sections of the EPR with tracked changes, to demonstrate changes based on feedback and consultation during the Notice of Commencement Phase is: https://parsons.sharefile. com/d-sd91ababeb2f4f05a
The link to download any appendices you require is: https://parsons.sharefile.com/ d-s85f936295294b43b
Attached is the Notice of Completion, the Table of Contents, the List of Appendices, and a memo documenting consultation during the Notice of Commencement Phase that has now ended. Further material is available at ottawa.ca/westernlrt and ottawa.ca/ouesttlr. The attached Notice of Completion documents how you may submit any questions, comments, or concerns to the appropriate parties.
*Sent on behalf of the City of Ottawa*
Thank you,
Stephen Fitzpatrick
Associate Environmental Planner
1223 Michael St., Suite 100, Ottawa, ON K1J 7T2
Office: +1 613.691.1586
Cell: +1 613.818.8184
PARSONS
ATTACHMENTS:
No comments:
Post a Comment